Quote:
Originally Posted by pmw103
Hi all,
Does any one know now long it normally takes to get from
5100 Bodyshop Start to 5500 Assembly Complete?
The dealer said today car (f10) is at 5100.
I found these status's via google dont know if they are 100%
thanks
Paul
Status Codes
0000 Cancelled
0037 Model or Feature Unavailable
0077 No Quota Available
0097qq No Current Event Allocated
0500 Cannot be Scheduled
1100 Scheduled
1200 Scheduled for Production
5000 Confirmed for Production
5050 Chassis Number Allocated
5055 Confirmed by Production Control
5100 Bodyshop Start
5190 Bodyshop Complete
5200 Paintshop Start
5270 Paintshop Complete
5300 Pre-Assembly Start
5400 Assembly Start
5500 Assembly Complete
6000 Transfer to Distribution
8200 Released to Carrier
9000 Departed Plant
9615/35/45 In Storage
9610/20/30/40/50/60 In Transit
9800 Arrived Dealer
|
? Normally I'd be more helpful if the info was buried in some thread approaching archiving, but your question is literally a sticky on this
forum.
Reading that will give you a lot more information beyond how long it takes a car to be built from start to finish.